Medical Gas Installation

Working together with Linde we helped a local hospital upgrade their medical gas storage and supply. The process involved getting the proper city permits. Understanding the rules and regulations involved with installation of medical gas. We excavated the site and installed the concrete pad and fencing to the storage tank. Linde came in and installed the tank and accessories. Then a professional plumber finished the job by connecting the new system to the existing system.

Shear Wall

Shear Wall

During a remodeling project on a military base two existing joining building walls were removed.  This caused the building to shift.  We were contracted by the General Contractor (GC) to reinforce/replace sections of the wall with a new Hybrid Steel Frame / Ordinary reinforced concrete shear wall system.    GC on the project presented to us the military’s plans.  We reviewed the plans and offered changes to help accommodate with the projects current level of completion.  Not interfering with current work and to spend as little time and money on the modification.  Once all plans were agreed upon, our portion of the remodel only lasted 17 days.

North Shear Wall

North wall was formed between (2) bays with Steel Frame reinforcement consisting of channel iron to contain the ends of the concrete and a horizontal wide flange beam to create a window to accommodate for the existing overhead duct work.   The traditional method of wood form work, steal snap ties and reinforcing bars were used when placing the concrete.

South shear Wall

South wall was also formed between (2) bays with Steel Frame reinforcement consisting of channel iron and wide flange beam.  Additionally because of the limited space between the walls we used steel plate backing and coil rods with the traditional wood form work on the front.

Concrete

Both walls were poured with a 4350 psi minimum concrete.  On site mixing, precise water control and vibrators placed along the wall form work during pumping insured that concrete flowed and distributed evenly.  Each wall was pumped on the weekend and was completed in less than 8 hours each.