Gallery 1

Replacement of electrical transformers in a manufacturing test facility

Frac sand possessing conveyor fabrication project

A design-build ventilation project of a cement finish mill building.

 

Top row of louvers are 105ft above ground level of which is about 1/2 the height of a wind generator shaft.

A design-build 12ft depth basement foundation

A bulk liquid oxygen storage facility in central Texas

A retro-fit upgrade of a hydraulic mold puller from a spin cast carbon cloth pipe in our fabrication shop

Replacing Fiberglass hot gas bypass duct with stainless steel at cement mill in South Texas

Gallery 1  Gallery 2  Gallery 3 Gallery 4 Gallery 5 Gallery 6 Gallery 7 Gallery 8