We install piping, vaults & tanks of all types

Remote access and confined space work

Replacement of 16” spout pipe 32’ above the mill roof and 177 feet above ground level while mill is running.

Gallery of projects done

Hurricane damage repaired
A design-build truss in an aerospace plant installed to allow installation of a 3rd autoclave.

Emergency response to storm damage Thursday June 12th 2014.  The 140 ft. X 55 ft. wall was restored upright and secured 115 hours after the storm and production was resumed Monday June 15th